- The production of DHW and heating is centralised on the rooftop with a microgeneration system.
- BIM, Last Planner System and 5S.
Residential
Trento Max
Customer: | Ebrosa |
Surface: | 17.700 m2 |
Time: | 22 months |
No. of houses: | 38 |
Building with 14 floors and four basements, where the communal areas are located: pool and green areas.