Trento Max

  • The production of DHW and heating is centralised on the rooftop with a microgeneration system. 
  • BIM, Last Planner System and 5S.
Residential
Trento Max
Customer: Ebrosa
Surface: 17.700 m2
Time: 22 months
No. of houses: 38
Building with 14 floors and four basements, where the communal areas are located: pool and green areas.